Thursday, November 21, 2013

Mullpperiar

1.         On 29-10-1886 a lease indenture for 999 years was do between Maharaja of Travancore and Secretary of State for India for Periyar irrigation works by another agreement in 1970, Tamil Nadu was permitted to generate line of credit also.   2.         The Mullaperiyar Dam was constructed during 1887-1895 across Periyar River in the then Travancore state (now Kerala) tinkers dam after said indenture. The Periyar Dam with full reservoir say of 152 ft. provides for diversion of wet from the reservoir through a daily round over to Vaigai basin in Tamil Nadu for irrigation benefits in 68558 ha.    3          In 1979, reports appeared in Kerala Press about the safety of Mulla Periyar Dam.   On twenty-fifth November, 1979 Chairman, CWC held discussions at Thirvananthapuram regarding strengthening Periyar dam with officers of Irrigation and Electricity, Deptt. of Kerala and PWD of Tamil Nadu.  In the meeting, extremity measures t o be completed before next monsoon (1980), modal(a) stipulation measures and long-term measures for strengthening of Periyar Dam were decided.  One of the urgency measures was to hand the shutters of fall raised fully to lower the reservoir spud aim to 136 ft.    4.
Order your essay at Orderessay and get a 100% original and high-quality custom paper within the required time frame.
         A second meeting under the Chairmanship of Chairman, CWC was held on twenty-ninth April 1980 at New Delhi and it was opined that after the completion of speck and medium term measures in the form of cable anchoring, the water take aim in the reservoir can be restored up to cxlv ft.   5.         As per the Memorandum on the reclamation of Mulla Periyar Dam inclined(p) by CWC and forwarded to Tamil Nadu on 25th March, 198! 6, touch measures were implemented. In the aforesaid Memo, CWC gave its tribute about peak deluge and sur hardihood of additional vents to be added in the spillway for implementing remaining emergency measure of providing additional spilling capacity.  It also gave its recommendation about the practice details of concrete backing on the downstream face of the dam.  Besides this, CWC...If you want to get a full essay, cabaret it on our website: OrderEssay.net

If you want to get a full information about our service, visit our page: write my essay

No comments:

Post a Comment